UTURITYStructures
Solutions
Products
About
Why Modular
How It Works
FAQ
Not sure?
Regions
THE VELOCITY PROTOCOL
Engineered precision.
Accelerated delivery.
We replaced the chaos of the jobsite with the precision of the factory. A singular, continuous pipeline from specification to handover in under 10 weeks.
10 weeks
Start to keys
6 phases
Fully managed
1,350+
Units delivered
< 3%
Defect rate
Scroll
THE TIME ADVANTAGE

From the same starting line.
Watch what happens.

Both projects start on the same day. Scroll down and watch the timelines diverge in real time.

TRADITIONAL CONSTRUCTION
FUTURITY MODULAR
Architect hired
Design process begins. Budget TBD.
Wk 1
Digital twin complete
Full structural simulation done. Manufacturing confirmed.
Wk 2
Wk 4
Wk 8
Wk 12
Wk 26
Wk 52
THE DELIVERY PROTOCOL

Six phases. Under 10 weeks.

Every phase is sequenced, managed, and certified. Click each phase to see what happens inside.

Week 1 / Day 1 (Std)
Phase 01

Estimate & Scoping

We issue a detailed, itemised estimate — model, delivery region, site conditions, delivery type. A real number, not a range. No pressure, no obligations.

Itemised Estimate
100%
Obligations
Zero
MANUFACTURING PROTOCOL

Inside the 48,000m² facility.

Six production zones. A continuous flow from raw steel to certified home. Click any zone to see what happens inside.

FUTURITY MANUFACTURING FACILITY — 48,000 m²FramingDays 1–5MEPDays 4–8InsulationDays 7–12FinishesDays 10–18Smart HomeDays 15–20QCDays 18–21ENTRY →← DELIVERY
Click any zone to explore what happens inside
Select a production zone
THE FINANCIAL CASE

The math they don't show you.

Drag the slider to see the cost difference at any project scale. Every number is based on real market averages.

Project size: 960 sqft
FUTURITY COST
US$129,648
US$110–US$161/sqft
YOU SAVE
US$98,112
43% less than traditional
TRADITIONAL COST
US$227,760
US$183–US$292/sqft
REGULATORY INTELLIGENCE

Code-compliant before it leaves our floor.

Hover any region on the map to see the specific certification and approval timeline that applies to your project.

Loading map...
Hover any highlighted region
We currently operate across all Canadian provinces and 22 US states.
CHOOSE YOUR PATH

Two ways to build

Both paths deliver the same precision-engineered unit. The difference is how much you want us to handle.

Factory-Direct
You manage the site. We deliver the structure.
You handle land, permits, foundation, and utilities. We manufacture your unit to CSA A277 certification and deliver it ready to crane onto your foundation.
Best for: Developers, builders, owner-builders.
YOUR RESPONSIBILITIES
A prepared and accessible site
A poured and certified foundation (to our specs)
Local permits secured
Utility connections ready at property boundary
WE DELIVER
Architectural digital twin
Full precision manufacturing
Delivery and craning
Structural assembly and enclosure
Recommended
Full Turnkey
Sign once. We handle everything.
One contract. One point of contact. We manage land sourcing, permits, foundation, utilities, installation, and handover. Built for homeowners who want their home delivered — not a construction project to manage.
Best for: Homeowners and investors.
EVERYTHING WE HANDLE
Land sourcing via partner network
Permit acquisition and submission
Foundation design and pour
Utility hookup and connections
Full installation and commissioning
Final inspection coordination
Keys to a move-in-ready home
Turnkey pricing includes a 20% premium over Factory-Direct. One contract covers everything.
CSA A277 Certified on every unit
FHA & VA mortgage eligible
2-5-10 warranty standard
YOU'VE SEEN HOW IT WORKS

Now start yours.

Configure my buildGet an estimateBrowse all modelsTalk to the team